Ground Preparation for Concreters (Driveway Kerbing)
![]() |
![]() |
|
1When laying kerbs on a pebble, |
2Starter bars placed in concrete should be no higher than 50mm and no further than 300mm apart. The ideal starter bar is galvanised wire 12 bar. |
|
![]() |
![]() |
|
3Plastic can be laid to protect your concrete, paved or asphalt driveways or paths.
|
4Hills Kerbs always works from right to left when standing on the lawn or driveway and facing the kerb. |