Ground Preparation for Landscapers
![]() |
![]() |
|
1Scrape the surface down to the natural hard and stable base. Laying the road base. Every 100mm of road base laid needs to be watered down and plate compacted. You will need a level pad of 850mm wide.
|
||
![]() |
![]() ![]() |
|
2You will need to compact |
3Concrete screeding must be done. Often a turf leveller will come in handy for this. |
|
![]() |
![]() |
|
4Laying the kerb. Hills Kerbs always works from right to left when standing on the lawn or driveway and facing the kerb.
|
5Finished kerb. |